SHENGSHI


MORE +
scroll down

                                                                                                                                                     

 

Project Type: Chemical Industry

 

 

Process introduction:

           

Raw water lifting tank, pre aeration tank, regulation tank, air flotation system, intermediate water tank, Fenton PH adjustment tank, Fenton reaction tank, Fenton coagulation tank, Fenton floc

Condensation tank Fenton air flotation tank, middle water tank, second pre hydrolysis tank, pre hydrolysis sedimentation tank, middle water tank, third anaerobic tower, anaerobic tower, sedimentation tank, first stage anoxic tank

Primary contact oxidation tank, secondary sedimentation tank, intermediate water tank, secondary anoxic tank, secondary contact oxidation tank, MBR tank, intermediate water tank, five filters

Tank clear water tank discharge

 

 

 

Emission standards:

           Liaoning Province's Comprehensive Wastewater Discharge Standards………………………………(DB21/1627-2008)

           Integrated Wastewater Discharge Standards……………………………………………(GB8978-1996)

           The main indicators are as follows:

No.

Project Drainage water quality

1

(COD)

≤300mg/L

2

Ammonia nitrogen

≤30mg/L

3

total nitrogen

≤50mg/L

4

PH

6~9

5

(SS)

≤300mg/L

 

 

 

 

Running effect:

Actual water production:300t/d

Actual processing effect:

NO.

Project Drainage water quality

1

COD

≤150mg/L

2

Ammonia nitrogen

≤5mg/L

3

Total nitrogen

≤50mg/L

4

PH

6~9

5

SS

≤50mg/L

 

 

online message

Submit Message